The Car Hire project is an investigation into linear functions. Suitable for level 4.0 - 6.0
Students analyse the cost structures of 3 car hire firms using Excel tables and then Graphically. Algebriac analysis can also be included. Students present their project conclusions through a powerpoint. The investigation can be extended using other scenarios.
This project has been fully linked to VELS outcomes.

Description
File/Link
Instructions to students

Source Chart for assessment Rubric

Refined assessment Rubric

Example of required Spreadsheet

Example of student presentation

Extension scenario